Operation | Section reference |
Remove the fuel tank | Removal of the fuel tank |
Remove the airbox | Removal of the airbox |
Disconnect the throttle cable | Removal of the throttle twistgrip |
Disconnect the choke cable | Removal of the choke cable |
Disconnect the connector (A) connecting the main wiring harness to the throttle position sensor (2).
Disconnect the wiring connector (B) connecting the main wiring harness to the air temperature sensor (7).
Detach the air pressure sensor (21) from the throttle body and disconnect the wiring connector (C) from the main wiring harness.
Loosen the clips (17) securing the throttle body to the intake manifolds (11).
Disconnect the wiring connectors (D) connecting the main wiring harness to the injectors (10).
Remove the throttle body assembly (26) from the motorcycle.
If necessary, slacken off the clamps (3) securing the throttle body to the hoses (4) and (16) and remove the hoses.
Undo the two screws (27) to remove the throttle position sensor (2) from the throttle body.
Removal of the fuel injectors
Undo the injector retaining clips (8) with the fuel feed hose (28), fuel return hose (29) and injector connection hose (30).
Undo the screws (25) to remove the injectors from the throttle body, recovering the washers (24).
Refitting the injectors
Lubricate the injector O-rings.
Locate the washers (30) and tighten the screws (25) to the specified torque (Engine torque settings).