![](https://motoinstruction.ru/img/bmw/6/114000.jpg)
Disengage fuel tank and pull to the rear.
Remove actuating cable for starting-speed increase.
Disengage Bowden cable (A).
Remove Bowden-cable cover from fitting for throttle actuation.
Disengage Bowden cable (B).
Disengage throttle cables from right and left throttle flap stubs.
Remove cable ties securing Bowden cables.
Disconnect engine breather line from engine.
Pull Bowden-cable divider (1) out of holder in direction indicated by arrow.
Installation is the reverse of the removal procedure.
If necessary, remove the intake air pipe.
Adjust Bowden cables.