- Slacken screws securing front footrest plate.
- Remove retainer pin (2).
- Disengage gearshift linkage at ball joint (1).
- Remove front footrest plate.
- Remove bearing screw (8).
- Remove retaining pin (5).
- Disengage gearshift linkage at ball joint (6).
- Remove relay lever (3).
- Remove selector lever (7).
- Installation is the reverse of the removal procedure: pay particular attention to the following.
Note: Note mark (arrow) on gearshift lever.
- Lubricate bearing bushing (4) with Staburags NBU 30 PTM or equivalent.
Note: Ball joint (1) on gearshift lever is secured with locking compound. After removal of ball joint (1) clean threads and install with small washer and Loctite 2701.
Tightening torques:
- Relay lever to cross tube — 9 Nm
- Pinch bolt of gearshift lever (7) — 9 Nm
- Ball head (1) to gearshift lever (clean thread + Loctite 2701) — 8 Nm